BCA-Registered · bizSAFE Star Certified · ISO Certified

HOME / ADDITION & ALTERATION WORKS

Addition & Alteration (A&A) Works Contractor Singapore

Structural & architectural changes to your property — approved, engineered, and delivered under one accountable team.

— YOUR PROJECT NEXT

Licensed A&A Contractor for Building Addition Works in Singapore

Addition & Alteration (A&A) works are structural or significant architectural changes made to an existing building. In Singapore, A&A works that affect the structure, external appearance, or use of a building require approval from URA, BCA, and in many cases a Qualified Person (QP) endorsement before any construction can begin.

 

VR Builder is an experienced addition and alteration contractor in Singapore, specialising in building addition works. We manage everything from landed property extensions and roof additions to commercial unit reconfigurations and industrial facility upgrades. On every project, we engage the necessary QPs, handle all URA, BCA, and authority submissions, and manage construction from approval to handover — under a single project manager throughout.

 

From residential addition and alteration works to commercial A&A projects — whether you are adding a room to your semi-detached, enclosing a balcony in your condo, or reconfiguring a commercial unit for change of use — VR Builder ensures your A&A project is fully compliant, structurally sound, and delivered on schedule.

 

No structural changes needed? See our office and commercial renovation services. Ending a lease? Our reinstatement works team returns the unit to shell condition.

— RECENT WORK

Renovation solutions across every property type

OFFICE RENO​

Full Office

Located in Beach Road - Office design, build, custom carpentry work and handover

OFFICE RENO

Office + Workspace

Located in Ang Mo Kio - Workspace design, carpentry build and handover

— RECENT WORK

Residential and Commercial Addition & Alteration Works

01

Landed Property Extensions
Room additions, second-storey extensions and rear extensions for semi-detached, terrace and bungalow properties.

02

Roof Additions & Attic Conversions
Roof form changes, attic conversions, and loft additions — engineered and submitted for approval before work begins.

03

Balcony & Yard Enclosures
Condo balcony and yard enclosures carried out within URA and MCST guidelines.

04

Commercial Unit Reconfiguration
Change-of-use and internal reconfiguration for retail, F&B and office units, with full authority submission.

05

Industrial Facility Upgrades
Structural upgrades to warehouses and factories — mezzanine additions, loading bay changes, and layout reconfiguration

06

Structural Wall & Column Works
Load-bearing wall removal or modification, engineered and QP-endorsed before construction.

— IN-HOUSE TRADES

Professional A&A services — all in-house

A&A works involve a broader range of trades than standard renovation — structural, architectural, and finishing trades all working in a carefully sequenced programme. VR Builder coordinates every trade in-house, under one project manager, ensuring your A&A project runs to programme without the communication breakdowns that come from managing multiple contractors.

Carpentry works for addition and alteration projects

Carpentry

Custom timber works including built-in cabinetry, wardrobes, shelving, door frames, and timber feature elements — crafted for both functionality and finish.

Hacking and demolition works

Hacking

Removal of existing floor and wall tiles, concrete slabs, or structural partitions to prepare the space for renovation — carried out with precision to minimise dust, debris, and disruption.

Partition wall installation

Partition Walls / Ceilings

Installation of lightweight partition walls and false ceilings using metal stud framing and gypsum board — ideal for space planning, concealing M&E services, and achieving clean architectural lines.

Brickwork and masonry works

Brickwork / Screed / Plastering / Skim Coat

Structural and finishing masonry works covering new brick wall construction, floor screeding for level surfaces, plastering for wall build-up, and skim coating for a smooth, paint-ready finish.

Flooring installation works

Flooring

Supply and installation of floor finishes including homogeneous tiles, porcelain, vinyl planks, and timber laminate — laid with precision for a seamless, durable surface.

Plumbing works

Plumbing & Sanitary

Full plumbing works encompassing water supply piping, drainage, sanitary fittings installation, and fixture connections for bathrooms, kitchens, and wet areas.

Electrical wiring works

Electrical

Comprehensive electrical works including wiring, DB board setup, power points, lighting installation, and compliance testing — carried out to BCA and SP Group standards.

— HOW IT WORKS

From QP endorsement to handover

STEP 01

Site Assessment & QP Engagement

We assess the structural scope and engage a Qualified Person to certify the works before submission.

STEP 02

URA / BCA Submission

Full authority submission and approval management — we deal with the agencies, not you.

STEP 03

Construction

In-house structural, carpentry and finishing trades execute to the approved plans under one project manager.

STEP 04

Inspection & Handover

Final inspection, as-built documentation, and handover with full compliance sign-off.

— Process

How an A&A project runs

Addition and alteration (A&A) works follow the same six steps as any project, with the approvals stage planned first:

  1. Free consultation and site visit
  2. 3D design and space planning
  3. Transparent itemised quotation
  4. Permits and regulatory submissions (BCA, SCDF, URA, JTC)
  5. Construction with a project manager on site and weekly milestone updates
  6. Quality check, defect rectification and handover with warranty documentation

Official guidance

What are A&A works?
Addition and alteration (A&A) works are structural or significant architectural changes to an existing building, such as extensions, roof additions, wall removal or a change of use.
Do A&A works need approval in Singapore?
Yes, when they affect the structure, external appearance or use of the building. These works need approval from URA (Urban Redevelopment Authority) and BCA (Building and Construction Authority), and in many cases a Qualified Person (QP) endorsement, before construction can begin.
Who handles the QP and authority submissions?
We do. We engage the Qualified Person, prepare and manage the URA and BCA submissions, and deal with the agencies on your behalf.
Can you extend a landed home?
Yes. We carry out landed property extensions, including room additions, second-storey extensions and rear extensions for semi-detached, terrace and bungalow homes, as well as roof additions and attic conversions. Each one is engineered, QP-endorsed and submitted to URA and BCA for approval before work begins.
What kinds of residential and commercial A&A works do you take on?
Landed property extensions (room additions, second-storey and rear extensions), roof additions and attic conversions, condo balcony and yard enclosures, commercial unit reconfiguration and change of use, industrial upgrades such as mezzanines and loading bays, and structural wall and column works.
What are the steps in an A&A project?
An A&A project runs in four steps:
  1. Site assessment and QP engagement.
  2. URA and BCA submission and approval.
  3. Construction to the approved plans by our in-house trades under one project manager.
  4. Final inspection, as-built documentation and handover with compliance sign-off.
Do I need renovation, A&A works or reinstatement?
It depends on what is changing. Renovation updates a space without structural changes, A&A works change the structure or use of a building, and reinstatement returns a leased unit to its original condition when the lease ends.
Renovation, A&A or reinstatement at a glance
ServiceUse it whenApprovals
RenovationYou want to change layout, finishes, carpentry or M&E without structural workBuilding management; authority approval only if structure, fire safety or use changes
A&A worksYou are changing the structure, external appearance or use of the buildingURA and BCA, often with a QP endorsement
ReinstatementYour lease is ending and the unit must go back to shell conditionLandlord or building management sign-off at handover
How much do A&A works cost in Singapore?
There is no fixed price. A&A works are priced project by project, because the existing structure, the approvals required, the finishes and site access change from one site to the next, so we do not quote a per-square-foot rate. A site assessment and itemised quotation give a far more reliable number than any online average. See what affects the cost of A&A works.
What factors affect A&A works pricing?
Eight factors drive most A&A costs:
  • Size and scope of the works
  • Structural modifications, often the biggest cost driver
  • Property type and existing condition
  • Qualified Person (QP) fees and authority approvals
  • Materials and finishes
  • Building services: electrical, plumbing, drainage, waterproofing and air-conditioning
  • Site access, shared walls and limited working hours
  • Complexity and customisation
How are A&A works different from a full renovation?
Renovation changes finishes and fittings such as flooring, paint, carpentry and lighting. A&A works change the building itself: its structure, floor area, external appearance or how a space is used. A full renovation can be extensive without being A&A, while removing a load-bearing wall, adding a mezzanine or converting a retail unit into an F&B outlet is A&A and usually needs approval.
What are minor A&A works?
Minor A&A works are smaller-scale changes within an existing unit. Our tuition centre project at Bukit Timah Shopping Centre is an example: removal works, partitions with glass doors, vinyl flooring, painting, electrical wiring, air-conditioning and an FSC submission. Even minor works in a shared building follow building management rules, and work affecting structure, fire safety or use may need authority approval.
Do I need BCA approval for renovation?
Only for some works. BCA is concerned with building safety: building works generally need approved plans, and structural works need approved structural plans and a permit before work starts. Minor repairs and finishes may only need building management approval, and HDB flats and condos have their own rules. Where approval is needed, a Qualified Person (QP) prepares the submission; we engage the QP and coordinate it.
How long does A&A works approval take in Singapore?
It varies with the authority, the complexity of the work and how complete the submission is, and the review time sits with the authority, so no contractor can promise it. Because construction usually cannot start until approvals are in hand, the submission stage often sets the real start date. We give you a realistic timeline after the site assessment. See which approvals A&A works need.

Last reviewed: October 2026

— YOUR PROJECT NEXT

Not sure which service you need?
Send us a floor plan.

Send your floor plan or a photo of your space — we'll assess the scope and come back with a full itemised quote within 24 hours. No obligations, no pressure.

CALL DIRECT — +65 8421 2329

Call WhatsApp Free Quote