BCA-Registered · bizSAFE Star Certified · ISO Certified
Uncategorized

Renovation Company Singapore: What Do They Actually Do?

9 min read By the VR Builders team
Renovation Company Singapore: What Do They Actually Do?

A renovation company in Singapore plans, builds and hands over changes to an existing space, whether that’s an HDB flat, a condo, a landed home, an office, a shop or an industrial unit. In practice that means coordinating the trades (hacking, masonry, tiling, carpentry, electrical, plumbing, air-conditioning, painting), getting the right approvals from HDB, BCA, URA or SCDF, and managing the schedule through to handover. What a particular company actually does depends on the property types it is registered and equipped for.

In this article

“Renovation Company in Singapore” Covers Several Kinds of Work

Search for a renovation company in Singapore and the results mix HDB specialists, office fit-out firms, industrial contractors and interior design studios, all under the same label. The label is broad because the work is. A renovation updates a space without structural change. Addition and alteration (A&A) works change the structure, external appearance or use of a building. Reinstatement returns a leased unit to its original condition when the lease ends. Each of these runs under different rules and needs different approvals.

Renovation company in Singapore at work on a residential interior

Here is the full range of work a renovation company may take on, with the approvals that usually come with it and our own published starting prices as a guide:

Type of workWhat it coversApprovals usually involvedOur guide price
HDB renovationHacking, tiling, waterproofing, kitchen, bathrooms, M&E, carpentryHDB renovation permit for listed works; DRC contractor required4-room full renovation from $40,000
Condo renovationLayouts, finishes, carpentry, M&ECheck the development’s management rules before work startsFrom $50,000
Landed home renovation and A&AInteriors through to extensions and structural changesURA and BCA where structure or floor area changes, through a Qualified Person (QP)Renovation from $100,000
Office and commercial renovationPartitions, ceilings, flooring, carpentry, M&E for a working businessBuilding management; SCDF if fire protection systems changeFrom $80/sqft
Industrial renovationWarehouses, factories, JTC units, MEP systemsLandlord (e.g. JTC) and authority submissions as requiredFrom $30/sqft
ReinstatementReturning a leased unit to its original conditionLandlord or building management sign-off at handoverOffice and commercial from $5/sqft

Final costs depend on size, scope, materials and site conditions, so treat these figures as starting points. A proper quotation should be itemised line by line.

What a Renovation Company Actually Does, Step by Step

Whatever the property type, a well-run renovation follows the same basic sequence:

  1. Site visit and scope. Measure the space, agree what is changing, and check whether any work touches structure, fire safety or the building’s use.
  2. Itemised quotation and schedule. Price each trade separately and agree a delivery timeline before work starts.
  3. Approvals. Apply for the HDB permit, management approval, or URA, BCA or SCDF submissions as needed. Structural and fire safety submissions go through a Qualified Person.
  4. Protection and hacking. Protect the unit and common areas, then remove existing finishes within the permitted hours.
  5. Building works and concealed services. Masonry, screeding, waterproofing, wiring, plumbing and air-conditioning piping go in while the walls and ceilings are open.
  6. Finishes and carpentry. Tiling, false ceilings, painting, then built-in carpentry and fittings.
  7. Testing, making good and handover. Test the electrical and plumbing works, clean, rectify defects and hand over.

Contractor, Interior Designer or Design-and-Build?

These three labels describe different ways of buying the same work:

  • Renovation contractor: builds to a scope or drawings you provide, using its own tradesmen and project management.
  • Interior design (ID) firm: leads with design work such as layouts, 3D visuals and material selection, then manages the build.
  • Design-and-build: one company handles both design and construction, so you get one quotation and one point of contact.

None of these is automatically better. Your choice depends on whether you already know what you want built or need help deciding. For commercial, industrial and A&A work, also check that the company’s registrations match the scope.

The Rules a Renovation Company Works Under in Singapore

HDB flats

  • DRC contractors only. Flat owners must engage only contractors from HDB’s Directory of Renovation Contractors (DRC), including for works that need no approval. Offences under HDB’s renovation rules can lead to a fine of up to $5,000 (HDB).
  • Approval for hacking. All demolition and hacking of walls, partial or complete, requires HDB’s prior written approval.
  • Working hours. General renovation is allowed from 9am to 6pm on weekdays and Saturdays. Noisy works are limited to 9am to 5pm on weekdays only, and no renovation is allowed on Sundays and public holidays.
  • New flats. Original toilet floor and wall finishes must not be replaced for 3 years from the block’s completion date, though new floor finishes can be laid over them with adhesives.
  • Waterproofing. New bathroom floor finishes need pre-packed waterproofing screed and a membrane upturned at least 150mm against walls and kerbs (HDB building works guidelines).
  • Licensed trades. Water service and sanitary works must be done by a PUB Licensed Plumber, and electrical installation by an EMA-licensed electrical worker (HDB renovation permit). Windows must be installed by BCA-approved window contractors listed with HDB (HDB window works).

BCA registration and licensing

BCA’s Contractors Registry System (CRS) registers firms by workhead (the type of work) and grade (the size of contract they may tender for). For example, CR06 “Interior Decoration & Finishing Works” covers interior design, planning and decoration, including ceiling panels, partitions, built-in fitments, raised floors, plastering and tiling (BCA CRS requirements). For 1 July 2025 to 30 June 2027, CR grade tendering limits run from S$0.8 million at L1 to unlimited at L6 (BCA tendering limits).

Separately, the Builders Licensing Scheme requires a licensed builder for building works where plans need approval from the Commissioner of Building Control. A Class 2 General Builder may take on projects of $6 million or less; a Class 1 General Builder has no project-value limit (BCA Builders Licensing Scheme). Air-conditioning units on a building’s exterior must be fitted by BCA-trained installers under Regulation 41B(2) of the Building Control Regulations 2003 (BCA air-conditioning safety).

Renovation project manager walking homeowners through the plans on site

URA for landed homes

A&A to a landed house can be lodged with URA under set conditions. The house must be on residential-zoned land outside conservation, Good Class Bungalow and Special Control areas. Added gross floor area must not exceed 50% of the existing approved area, and the works must comply with Envelope Control with no more than one full mezzanine floor. A Qualified Person must be appointed (URA).

SCDF for commercial and industrial spaces

Under the Fire Safety Act 1993, anyone carrying out fire safety works must first get SCDF approval of plans. Fire safety works include installing, altering, removing or relocating sprinklers, fire alarm panels, hose reels, exit signs and fire doors. QPs submit the plans (SCDF). Listed minor works can go through SCDF’s lodgement scheme instead: a QP files before work starts, at $90 per submission (SCDF minor works).

How to Check a Renovation Company Before You Sign

  1. For an HDB flat, confirm the company is on HDB’s Directory of Renovation Contractors.
  2. For commercial, industrial or A&A work, check its BCA CRS workheads and grade, and whether it holds a builder’s licence if plans need BCA approval.
  3. Ask who does each trade: in-house teams, or licensed specialists for electrical, plumbing, windows and air-conditioning.
  4. Ask for an itemised quotation and a written schedule, not a single lump sum.
  5. Look at completed projects of the same property type as yours.

Our fuller checklist on what to verify before hiring a renovation contractor goes through each of these in detail.

What We Do at VR Builders

We are a BCA-registered renovation contractor with 25 years in the trade, a 125-strong in-house workforce and more than 200 completed projects. We are HDB Renovation Permit registered, hold bizSAFE Star and ISO 9001, 14001 and 45001 certifications, and work across commercial, office, industrial, reinstatement and residential projects. Every job gets a dedicated project manager, an itemised quotation and a delivery timeline written into the contract. We handle the BCA, SCDF, URA and JTC submissions on your behalf.

Recent work covers that full range:

See our portfolio, or the service pages for office and commercial renovation, industrial renovation, A&A works and reinstatement.

Frequently Asked Questions

What does a renovation company in Singapore do?

It plans and carries out changes to an existing space. That means coordinating trades such as hacking, tiling, carpentry, electrical, plumbing and air-conditioning, obtaining HDB, BCA, URA or SCDF approvals where needed, and managing the work through to handover.

How much does renovation cost in Singapore?

As a guide, our prices start from $40,000 for a 4-room HDB full renovation, $50,000 for a condo and $100,000 for a landed home. Office renovation starts from $80/sqft, industrial from $30/sqft, and office and commercial reinstatement from $5/sqft. Final cost depends on scope and site conditions.

Do I need an HDB-approved contractor to renovate my flat?

Yes. HDB requires flat owners to use contractors from its Directory of Renovation Contractors for all renovations, including works that do not need a permit.

Is office renovation different from home renovation?

Yes. Office work involves building management rules, M&E coordination for a working business, and often SCDF approval when sprinklers, fire alarms or exit signs are affected. None of these apply to a typical flat.

When do renovation works need a Qualified Person?

When plans must be approved by an authority. Examples include structural works under BCA, A&A to a landed house lodged with URA, and fire safety works that need SCDF plan approval.

What is the difference between renovation, A&A and reinstatement?

Renovation updates a space without structural change. A&A works change the structure, external appearance or use of a building. Reinstatement returns a leased unit to its original condition at the end of a lease. Our guide to commercial reinstatement works covers that last one in detail.

Sources

Share this article
Free site assessment

Planning a similar renovation?

Talk to a VR Builders project manager. We'll visit the site, scope the works and give you a clear, itemised quotation.

Get Free Quote WhatsApp us
Call WhatsApp Free Quote