BCA-Registered · bizSAFE Star Certified · ISO Certified
Case Study

80C Telok Blangah St 31 Renovation: A Completed VR Builders Project Case Study

4 min read VR Builders Team
HDB renovation 80C Telok Blangah
Project Title: 80C Telok
Blangah St 31
Reno Type: Commercial Renovation Works
Location: 80C Telok
Blangah St 31
Duration: June 2026 to July 2026

1. Project Overview

This case study documents the renovation at 80C Telok Blangah St 31, a renovation project carried out from June 2026 to July 2026. The project involved a comprehensive scope of renovation works, from site preparation and hacking through to final making-good and completion, all carried out in accordance with requirements.

2. Renovation Works at 80C Telok Blangah St 31

The renovation works at 80C Telok Blangah St 31 covered the full renovation journey for the unit, beginning with the necessary regulatory approvals, permits, and site preparation and protection, and progressing through structural, mechanical and electrical, and finishing works. As with any renovation project in Singapore, the works were carried out in accordance with Commercial requirements throughout.

3. Scope of Renovation Works

The overall scope of Commercial renovation works undertaken at this Telok Blangah renovation project included:

  • Site preparation and protection
  • Commercial permit and approval requirements
  • Hacking and demolition works
  • Removal and disposal of existing finishes
  • Masonry and partition works
  • Floor and wall tiling including tile laying, screeding and grouting works
  • Waterproofing works
  • Kitchen and bathroom renovation
  • Plumbing and sanitary modifications
  • Electrical wiring, power points and lighting installation
  • Air-conditioning and ACMV works
  • False ceiling works
  • Painting and decorative finishes
  • Doors and windows works
  • Aluminium and glass works
  • Customised carpentry including kitchen cabinets, wardrobes, TV feature walls, storage cabinets and built-in furniture
  • Loose furniture installation
  • Sanitary fittings and accessories
  • Kitchen fittings
  • Grilles and metal works
  • Installation of household fixtures
  • Final making-good, cleaning, debris removal, reinstatement, testing and completion in accordance with Commercial requirements

4. Site Preparation, Hacking and Demolition

Works at 80C Telok Blangah St 31 began with site preparation and protection, followed by the necessary permit and approval requirements to ensure the renovation complied with applicable regulations from the outset. This was followed by hacking and demolition works, along with the removal and disposal of existing finishes to prepare the unit for the renovation works ahead.

5. Masonry, Tiling and Waterproofing

Structural and finishing works included masonry and partition works, together with floor and wall tiling covering tile laying, screeding and grouting works. Waterproofing works were also carried out as part of this renovation work scope.

6. Kitchen and Bathroom Renovation

The project scope included kitchen and bathroom renovation, along with plumbing and sanitary modifications, sanitary fittings and accessories, and kitchen fittings, addressing these key areas of the home as part of the overall renovation.

Mechanical and electrical works carried out at the unit included electrical wiring, power points and lighting installation, plumbing and sanitary modifications, and air-conditioning and ACMV works, forming part of the essential systems upgraded during the renovation.

8. False Ceiling, Painting and Finishing Works

Finishing works included false ceiling works and painting and decorative finishes, contributing to the overall completed look of the renovated unit.

9. Doors, Windows, Aluminium and Glass Works

The renovation also covered doors and windows works, aluminium and glass works, and grilles and metal works, addressing the openings and fittings of the unit.

10. Customised Carpentry and Built-in Furniture

A significant part of the project involved customised carpentry, including kitchen cabinets, wardrobes, TV feature walls, storage cabinets and built-in furniture. Loose furniture installation and the installation of household fixtures were also carried out as part of this scope.

11. Final Making-Good, Cleaning and Completion

The project concluded with final making-good, cleaning, debris removal and reinstatement, followed by testing and completion in accordance with applicable requirements, marking the completion of the renovation works at 80C Telok Blangah St 31 in July 2026.

Conclusion

The renovation at 80C Telok Blangah St 31 reflects a comprehensive scope of renovation works carried out from June 2026 to July 2026, spanning site preparation, structural works, mechanical and electrical installations, finishing works, customised carpentry and final completion, all in accordance with applicable requirements. This project illustrates the range of works typically involved in a full-scope residential renovation project in Singapore.

Share this article
Free site assessment

Planning a similar renovation?

Talk to a VR Builders project manager. We'll visit the site, scope the works and give you a clear, itemised quotation.

Get Free Quote WhatsApp us
Call WhatsApp Free Quote