Reinstatement Works – Commercial, Retail & F&B Projects

9 min read By the VR Builders team
Commercial reinstatement

Commercial reinstatement in Singapore means returning a leased office, retail shop or F&B unit to the original condition set out in the tenancy agreement, usually bare shell, before the lease ends. The work removes partitions, ceilings, raised floors, carpentry and M&E fit-out, makes good the finishes, and closes with a joint inspection and handover to the landlord. It typically takes 2 to 4 weeks, and it has to pass the landlord’s inspection for your security deposit to be released without dispute.

In this article

We have carried out reinstatement works at shopping malls, retail shops and F&B outlets across Singapore. This guide covers what your lease obliges you to do, which approvals apply, the typical scope, and the locations and documentation from our own projects.

1. Your Reinstatement Obligations Under a Commercial Lease

Most commercial leases require the tenant to hand the unit back in its original condition. The tenancy agreement defines what “original” means. Before quoting, we confirm the original shell condition against the tenancy agreement so the scope cannot be disputed later.

  • Retail leases. The Lease Agreements for Retail Premises Act 2023 came into operation on 1 February 2024 (Singapore Statutes Online). It makes the Code of Conduct for Leasing of Retail Premises mandatory for qualifying retail leases of at least one year signed or renewed from that date. It does not cover industrial, office or residential space (Singapore Business Federation).
  • Security deposits on small retail units. The Code caps security deposits at three months’ gross rent for retail premises of up to 5,000 sq ft on leases of up to three years. The government describes the cap as balancing tenants’ cash flow against “protecting landlords from the cost of reinstating the unit” (Ministry reply to Parliament).
  • JTC industrial premises. JTC requires tenants to reinstate their premises before returning them on the lease expiry date. It arranges a joint site inspection about 6 months before the lease expires, then sets out the reinstatement requirements. If reinstatement is not completed by expiry, the tenant is liable to pay double rent from the expiry date (JTC).

2. Approvals, Permits and Licensed Trades

Reinstatement looks like demolition, but in a mall or office tower it runs under the same controls as any fit-out:

  • Building management. On our projects, building management approval, a Permit-to-Work (PTW), insurance documents and a method statement and risk assessment are arranged before work starts.
  • Fire safety (SCDF). Under the Fire Safety Act 1993, fire safety works need SCDF plan approval first. Fire safety works include installing, altering, removing or relocating hose reels, fire alarm panels, sprinklers, emergency exit signs and fire doors, and plans are submitted by Qualified Persons (SCDF). Listed minor alterations can instead be lodged by a QP before work starts, at $90 per submission (SCDF minor works). When a fit-out added or moved sprinklers or exit signs, reversing that is fire safety work too.
  • Structural works (BCA). A building permit is required for all building works except those classed as insignificant. For structural works, the appointed QP must obtain structural plan approval and a permit before construction begins (BCA). If the original fit-out involved structural changes, reversing them is handled as addition and alteration works.
  • Electrical works. Electrical works such as wiring and RCCB installation must be undertaken by a licensed electrical worker (LEW) (Ministry reply to Parliament).
  • F&B grease traps. All food-handling establishments require grease traps, and owners must get NEA’s and PUB’s approval before installing one (PUB). Confirm with the landlord whether the grease trap stays or goes as part of the F&B reinstatement.
  • Workers’ insurance. Employers must buy work injury compensation insurance for all employees doing manual work (MOM). On our projects, insurance documents are submitted to building management before work begins.

On our projects, the approvals and site-management items include:

  • Obtaining building/management approval
  • Submission of insurance documents
  • Permit-to-Work applications
  • Method statement and risk assessment submissions
  • Worker/site access coordination
  • Delivery arrangements
  • Loading bay coordination
  • Hoarding and site protection
  • Daily housekeeping
  • Debris removal and bin/waste management
  • Coordination with building management and relevant contractors

3. Our Reinstatement Works Scope

Our commercial reinstatement scope includes:

  • Site inspection and assessment
  • Management approval
  • Submission of insurance documents
  • Permit-to-Work (PTW) applications
  • Method statement and risk assessment submissions
  • Site access coordination
  • Protection of existing premises
  • Dismantling and removal of existing installations
  • Hacking and demolition works
  • M&E disconnection and reinstatement
  • Floor and wall finishes
  • Tile removal and reinstatement
  • Ceiling and partition removal
  • Carpentry dismantling
  • Electrical and plumbing reinstatement
  • Painting and making-good works
  • Waste disposal and bin management
  • Final cleaning
  • Defect rectification
  • Inspection, testing and complete handover documentation

What the work involves varies by unit type:

Unit typeTypical reinstatement itemsCommon authority touchpoints
OfficePartitions, raised floors, false ceilings, carpentry, M&E removal, aircon cap-off, patching, skim coat, repaintingBuilding management PTW; SCDF if fire protection systems were altered; LEW for electrical
Retail shop (mall)Dismantling of existing installations, carpentry, ceilings, floor and wall finishes, return to bare shellMall management approval and PTW; SCDF for sprinklers or exit signs; LEW
F&B outletKitchen fittings, flooring, ceilings, partitions, plumbing and sanitary installations, M&E servicesManagement approval; NEA and PUB for grease traps; licensed trades for plumbing and electrical
Industrial / JTC unitMezzanine removal, floor restoration, full site clearanceJTC joint inspection and requirements; BCA permit and QP if structural

4. Our Reinstatement Process

  1. Fast mobilisation. We assess the site and mobilise a crew within days. Send a floor plan or photos, and we reply with an itemised quote within 24 hours.
  2. Scope confirmation. We confirm the original shell condition against the tenancy agreement.
  3. Approvals and site set-up. We secure management approval, PTW, insurance, method statement and risk assessment, then set up hoarding and protection.
  4. Coordinated execution. Our in-house trades handle hacking, M&E removal, patching, painting and flooring in sequence.
  5. Landlord liaison. We coordinate directly with building management throughout the works.
  6. Final inspection and handover. We do a joint walkthrough with the landlord’s representative, then deliver the handover documentation.

As a guide, office and commercial reinstatement starts from $5 per square foot. The final cost depends on the size of the unit and how much fit-out has to come out.

5. Commercial / Shopping Mall Locations

We have carried out shopping mall reinstatement works at the following commercial and shopping mall locations:

  • Raffles City
  • Suntec City
  • Marina Square
  • Millenia Walk
  • The Shoppes at Marina Bay Sands
  • Clarke Quay
  • People’s Park Complex
  • Tanjong Pagar Centre
  • One Raffles Place
  • ION Orchard
  • Paragon
  • Orchard Central
  • Tang Plaza
  • Far East Plaza
  • Shaw House
  • Forum The Shopping Mall
  • Great World
  • Parkway Parade
  • Katong Shopping Centre
  • Tampines Mall
  • Tampines 1
  • Century Square
  • Changi City Point
  • Jewel Changi Airport
  • Eastpoint Mall
  • Our Tampines Hub
  • Bedok Point
  • VivoCity
  • HarbourFront Centre
  • Westgate
  • JEM
  • IMM
  • Northpoint City
  • Causeway Point
  • AMK Hub
  • Thomson Plaza
  • Guthrie House

6. Retail / Commercial Shops

Our retail reinstatement works have been carried out for the following retail and commercial shops:

  • Gucci
  • Prada
  • Coach
  • Rolex
  • Tiffany & Co.
  • Dyson
  • Courts
  • Watsons
  • Guardian
  • Skechers
  • Charles & Keith
  • Giordano
  • Malabar Gold & Diamonds

7. Restaurant / F&B Outlets

We have also carried out F&B reinstatement works for various restaurant and F&B outlets. This work covered dismantling and removing existing fittings, flooring, ceilings, partitions, carpentry, M&E services, and plumbing and sanitary installations, followed by waste disposal, making good, cleaning and final handover.

8. Inspection, Testing & Handover Documentation

We prepare and coordinate the inspection, testing and handover reports that building management asks for, including:

  • Reinstatement Completion Report
  • Final Site Handover Report
  • Site Inspection Report
  • Before & After Photo Report
  • Defect Inspection & Rectification Report
  • Floor Trap Inspection / Testing Report
  • Plumbing & Drainage Testing Report
  • Waterproofing / Water Ponding Test Report
  • Electrical Testing & Inspection Report
  • Lighting Testing Report
  • Fire Alarm Testing & Inspection Report
  • Fire Sprinkler Testing & Inspection Report
  • Fire Protection System Inspection Report
  • Sprinkler Testing / Commissioning Report
  • Fire Hose Reel Inspection Report
  • Fire Extinguisher Inspection / Service Report
  • Emergency Lighting & Exit Signage Testing Report
  • ACMV Testing & Commissioning Report
  • M&E Reinstatement Completion Report
  • Flooring / Tile Inspection Report
  • Ceiling Inspection Report
  • Final Cleaning Report
  • Waste Disposal / Bin Management Record
  • Permit-to-Work Closure Record
  • Final Site Handover Checklist
  • Work Completion / Completion Certificate

Frequently Asked Questions

What is commercial reinstatement in Singapore?

It is restoring a leased commercial unit (an office, shop or F&B outlet) to the original condition in the tenancy agreement, usually bare shell, before handing it back at the end of the lease.

How long does commercial reinstatement take?

Typically 2 to 4 weeks, depending on the size of the unit and the fit-out to be removed. Allow extra time for management approvals and any SCDF or BCA submissions.

How much does reinstatement cost?

As a guide, our office and commercial reinstatement starts from $5 per square foot. We give an itemised quote within 24 hours of receiving a floor plan or photos.

Do I need SCDF approval to remove sprinklers or exit signs?

Removing or relocating fire protection systems such as sprinklers, fire alarm panels, hose reels and exit signs counts as fire safety works, which need SCDF plan approval through a Qualified Person. Listed minor alterations can go through SCDF’s lodgement scheme instead.

What happens if I return a JTC unit without reinstating it?

JTC requires reinstatement before the lease expiry date. If the works are not completed by then, the tenant is liable to pay double rent from the expiry date.

What documentation is provided upon handover?

Our standard documents include the Reinstatement Completion Report, Final Site Handover Report, Site Inspection Report, Before & After Photo Report, Defect Inspection & Rectification Report, and the testing and inspection reports listed above.

Related reading: Reinstatement in Singapore: a guide · Office reinstatement and handover · What a renovation company in Singapore does · Office and commercial renovation

Sources

Share this article
Free site assessment

Planning a similar renovation?

Talk to a VR Builders project manager. We'll visit the site, scope the works and give you a clear, itemised quotation.

Get Free Quote WhatsApp us
Call WhatsApp Free Quote